Modern Roofing Case Studies

Real projects, real roof conditions and practical roofing solutions delivered across Scotland.

Explore a selection of Modern Roofing projects covering industrial roof refurbishment, single-ply membranes, metal roof treatment, roof appraisals and survey-led recommendations.

Established 2007Almost two decades of roofing experience
Scotland-WideIndustrial and commercial projects
Survey-LedEvidence before recommendation
Real Project ProofLocations, systems and outcomes

Featured Roofing Projects

These case studies have been selected to show the breadth of work Modern Roofing has delivered throughout the life of the company, from early installations that remain in service today to modern roof refurbishments, surveys, safety systems and specialist waterproofing projects. Together, they demonstrate the range of roof types we work on, the longevity of our installations and how our approach has developed alongside modern materials, technology and changing client requirements.

Completed 2000 square metre Sika membrane roof refurbishment in Cumbernauld Sika Membrane

2,000m² Industrial Roof Refurbishment

The AG Barr Irn-Bru Factory roof was assessed area by area, with strip-off, direct overlay and recovery-board solutions installed beneath a new Sika membrane system.

SiteAG Barr Irn-Bru Factory
Completed2026
ScaleApprox. 2,000m²
SystemSika membrane
View the project
East Kilbride Police Station roofing works with liquid-applied roofing and Sika single-ply membrane areas Liquid Roofing & Sika Single-Ply

East Kilbride Police Station Roof Renewal

Completed in 2024, this project combined approximately 3,000m² of liquid-applied roofing works with around 700m² of new Sika single-ply membrane, giving the client a coordinated refurbishment solution across different roof areas.

SiteEast Kilbride Police Station
Completed2024
ScaleApprox. 3,700m²
SystemLiquid roofing & Sika single-ply
View the project
Completed non-VOC liquid waterproofing at the Glasgow Science Centre children's water play area Non-VOC Liquid Waterproofing

Glasgow Science Centre Water Play Area

A 50m² children's water-play area was waterproofed during nightshift using a low-odour, non-VOC liquid membrane selected for safe use around young visitors and constant wet conditions.

SiteGlasgow Science Centre
Completed2023
ScaleApprox. 50m²
SystemNon-VOC liquid membrane
View the project
Blurred front cover of the John Dewar and Sons Bacardi cask warehouse gutter appraisal Gutter Appraisal

John Dewar & Sons / Bacardi — Cask Warehouse Appraisal

A detailed appraisal of the internal gutters and siphonic drainage serving a Glasgow cask warehouse, identifying failed membrane joints, corrosion, blisters, displaced baffle plates, blocked outlets and inadequate overflow provision.

SiteJohn Dewar & Sons / Bacardi
Completed2024
Scale6 gutters / approx. 342 lm
SystemSiphonic gutter appraisal
View the project
Completed Bauder roof refurbishment at Aldi Renfrew Bauder Roof

Aldi Roof Refurbishment

Existing felt roof stripped before a new Bauder felt vapour-control layer, insulation and single-ply membrane system were installed by Bauder-trained installers.

SiteAldi Renfrew
Completed2014
ScaleApprox. 2,000m²
SystemBauder single-ply
View the project
Ming's Restaurant Sarnafil roof in Cumbernauld Sarnafil Roof

Ming's Restaurant Sarnafil Roof

Installation of the Sarnafil single-ply membrane and decor-profile roofing works. The original roof remains in service.

SiteMing's Restaurant
Completed2007
ScaleComplete restaurant roof
SystemSarnafil single-ply
View the project
Carlton Bingo Dumbarton during the asbestos-cement roof replacement works Metal Roofing

Factory Cut Edge Corrosion Treatment

Rooflights were netted, handrail installed and affected sheet edges ground back to sound steel before primer and two coats of liquid-plastic treatment.

SiteAirdrie Factory
Completed2024
ScaleTargeted roof treatment
SystemLiquid-plastic treatment
View the project
Completed Sika single ply membrane roof replacement at Lanark Sheriff Court Sika Roof Replacement

Lanark Sheriff Court Roof Replacement

The existing roof was stripped off and replaced with a new Sika single-ply membrane system, with the works planned around an occupied court building.

SiteLanark Sheriff Court
Completed2024
ScaleComplete roof replacement
SystemSika single-ply
View the project
Completed Sika single-ply warm roof overlay at Fairmile Church Edinburgh Sika Warm Roof Overlay

Fairmile Church Edinburgh Roof Overlay

Approximately 400m² of existing standing-seam metal roofing was upgraded with insulation infill, vapour control, additional insulation, marine plywood, protective fleece and a mechanically fixed Sika single-ply membrane.

SiteFairmile Church, Edinburgh
Completed2024
ScaleApprox. 400m²
SystemSika single-ply overlay
View the project
Completed single-ply membrane school roof refurbishment in Ayrshire School Roof Replacement

Ayrshire School Warm Roof Refurbishment

The existing school roof was stripped off and rebuilt with a new vapour-control layer, Kingspan TR26 insulation, tapered insulation to improve falls and a single-ply membrane finish.

SiteAyrshire School
Completed2022
ScaleFull school roof
SystemSingle-ply warm roof
View the project
Perth RC Campus roofing project including curved gym hall roof Campus Roof Package

Perth RC Campus Roofing Works

A major 7,000m² campus roofing project completed in 2016. Modern Roofing installed all of the metal decking across the campus, followed by the vapour-control layer, insulation and single-ply membrane build-up. The approximately 1,400m² gym roof was formed using curved perforated metal decking, while the separate plenum roof was the only area finished with standing-seam profiles.

SitePerth RC Campus
Completed2016
ScaleApprox. 7,000m²
SystemMetal deck & single-ply
View the project
Completed Sika fleeceback membrane roof overlay at Bathgate Nursery Sika Membrane Overlay

Bathgate Nursery Roof Overlay

A roof appraisal and core sample identified only isolated damp insulation, allowing local replacement before a full Sika fleeceback membrane overlay was installed across the live nursery building.

SiteBathgate Nursery
Completed2010
ScaleApprox. 700m²
SystemSika fleeceback membrane
View the project
Completed liquid roof coating at Caldriven Manufacturing Works Liquid Roof Coating

Caldriven Manufacturing Works Roof Coating

Approximately 4,000m² of asbestos cement roofing at Caldriven Manufacturing Works was carefully cleaned and prepared before a liquid-applied coating system was installed to improve weather protection and extend its service life.

SiteCaldriven Manufacturing Works
Completed2023
ScaleApprox. 4,000m²
SystemLiquid-applied coating
View the project
Completed Euroclad goosewing grey metal roof at O-I Glass in Alloa Metal Roof Replacement

O-I Glass Alloa — Metal Roof Replacement

Approximately 1,700m² of existing roof covering was stripped off before new Euroclad goosewing-grey box-profile roof sheets were installed. The full roof area was safety-netted from below throughout the works.

SiteO-I Glass, Alloa
Completed2025
ScaleApprox. 1,700m²
SystemEuroclad box-profile sheets
View the project
Completed Euroclad goosewing grey metal roof at Carlton Bingo Dumbarton Asbestos Roof Replacement

Carlton Bingo Dumbarton Roof Replacement

An approximately 800m² asbestos-cement roof was carefully stripped and replaced with new Euroclad goosewing-grey metal sheets. Full scaffold access, edge protection and safety netting were provided, with removed sheets lowered by scissor lift into a dedicated enclosed skip.

SiteCarlton Bingo, Dumbarton
Completed2016
ScaleApprox. 800m²
SystemEuroclad metal sheets
View the project
Completed roof safety-line works at the AG Barr site Roof Safety Lines

AG Barr — Large-Scale Safety-Line Works

Modern Roofing delivered and coordinated thousands of metres of roof safety-line works across the AG Barr site, together with protected access routes and rooflight covering to support safer access to rooftop plant.

SiteAG Barr
Completed2024
ScaleThousands of metres
SystemRoof safety-line systems
View the project
Completed Sika membrane walkway installation at Calderstone Industrial Products Ltd Sika Roof Walkway

Calderstone Industrial Products Ltd Roof Walkway

Approximately 900 linear metres of reinforced Sika walkway were installed over the existing Sika roof to improve safe access, together with new Sika membrane detailing around roof vents.

SiteCalderstone Industrial Products Ltd
Completed2026
ScaleApprox. 900 linear metres
SystemReinforced Sika walkway
View the project
Blurred example of a detailed Modern Roofing roof appraisal report Roof Appraisal

Public-Sector Roof Appraisal

Detailed appraisal combining roof inspection, photographic reporting, defect observations, safety-line review and practical recommendations for planned remedial works.

SiteForfar public-sector site
Completed2023
ScaleDetailed roof appraisal
SystemSurvey & reporting
View the project

AG Barr Irn-Bru Factory — 2,000m² Sika Membrane Refurbishment

Completed in 2026, Modern Roofing acted as the main roofing contractor at the AG Barr Irn-Bru Factory and provided a practical solution for each flat-roof area. Core samples and roof appraisals were used to establish the condition and build-up of each section before work started.

Failed areas were stripped and rebuilt with a new vapour-control layer, insulation and Sika membrane. Suitable felt areas were overlaid directly, while the largest old Protan areas received a recovery board before the new membrane was installed.

RoleMain roofing contractor
Completed2026
ScaleApproximately 2,000m²
InvestigationAppraisals and core samples
SystemSika membrane refurbishment
↑ Back to featured projects
Aldi Renfrew roof before the Bauder refurbishment Aldi Renfrew completed Bauder roof refurbishment Before After
Drag the centre handle to compare the roof before and after.

Aldi Renfrew — Bauder Roof Refurbishment

Modern Roofing supplied Bauder-trained installers for the approximately 2,000m² roofing project completed in 2014. The existing felt roof was stripped before a new Bauder felt vapour-control layer, Bauder insulation and Bauder single-ply membrane system were installed.

The project demonstrates historic installation experience with a complete commercial warm-roof refurbishment build-up rather than a local patch repair.

LocationRenfrew
Completed2014
Roof areaApproximately 2,000m²
RoleBauder-trained installers
Build-upVCL, insulation and membrane
↑ Back to featured projects
Ming's Restaurant Sarnafil membrane roof in Cumbernauld

Ming's Restaurant — Sarnafil Roofing Experience

In 2007, Modern Roofing installed the Sarnafil single-ply membrane and decor-profile roofing works at Ming's Restaurant in Cumbernauld.

The original Sarnafil roof remains in service, providing useful long-term evidence of the installation and system performance.

SiteMing's Restaurant, Cumbernauld
Installed2007
SystemSarnafil single-ply
Current positionRoof remains in service
↑ Back to featured projects

Airdrie Factory — Cut Edge Corrosion Treatment

Completed in 2024, the metal roof sheets had corrosion developing at the exposed cut edges. Rooflights were netted and handrail installed to support controlled access before the affected edges were prepared.

The corroded areas were ground back to sound steel, primed and protected with two coats of liquid-plastic cut edge treatment to help reduce further deterioration and extend the usable life of the existing roof sheets.

LocationAirdrie
Roof typeMetal factory roof
Completed2024
PreparationGround back to sound steel
TreatmentPrimer and two coats
↑ Back to featured projects
Completed Airdrie factory roof cut edge corrosion treatment
Completed Lanark Sheriff Court Sika single ply membrane roof replacement

Lanark Sheriff Court — Sika Roof Replacement

Completed in 2024, the existing roof at Lanark Sheriff Court was stripped off rather than covered over. Modern Roofing then installed a new Sika single-ply membrane roof as a complete replacement system.

The building remained operational, so access, safety, sequencing and disruption had to be carefully managed around the normal use of the court. The project demonstrates experience delivering substantial commercial roofing works on an occupied public building.

LocationLanark
Completed2024
BuildingOccupied sheriff court
ScopeExisting roof stripped off
New systemSika single-ply membrane
↑ Back to featured projects

Fairmile Church, Edinburgh — Standing-Seam Metal Roof Overlay

Completed in 2024, Modern Roofing upgraded approximately 400m² of existing standing-seam metal roofing at Fairmile Church in Edinburgh with a thermally improved, condensation-controlled Sika single-ply warm roof overlay.

The gaps between the existing standing seams were filled with insulation to create a more continuous surface, reduce thermal bridging and provide support for the new layers above. A Sarnavap 5000E self-adhesive vapour-control layer was then incorporated as part of the warm roof build-up, followed by additional insulation to improve thermal performance.

Marine plywood was installed to form a stable fixing substrate, with a protective fleece layer above it to help protect the waterproofing membrane from abrasion. The roof was completed with a mechanically fixed Sika single-ply membrane, including carefully formed perimeter bars, upstands, pipe penetrations and rooflight details.

The overlay approach avoided an unnecessary full strip-off while improving waterproofing, thermal performance and condensation control, with the works planned to keep disruption to the church to a minimum.

SiteFairmile Church, Edinburgh
Completed2024
Roof areaApproximately 400m²
Existing roofStanding-seam metal roof
Vapour controlSarnavap 5000E
Build-upInfill, insulation, plywood and fleece
SystemMechanically fixed Sika single-ply membrane
ApproachWarm roof overlay with minimal disruption
↑ Back to featured projects

Ayrshire School — Full Warm Roof Refurbishment

Completed in 2022, Modern Roofing carried out a complete school roof refurbishment in Ayrshire, stripping off the existing roof covering so the new system could be installed onto a properly prepared substrate rather than relying on short-term patch repairs.

A new vapour-control layer was installed as part of the insulated warm roof construction. Kingspan TR26 insulation upgraded the thermal performance, while tapered insulation was used to create improved falls and direct rainwater more effectively towards the drainage points.

The roof was finished with a modern single-ply membrane waterproofing system, with careful detailing around roof edges, upstands, outlets and penetrations. The completed build-up provided the school with improved waterproofing, insulation performance and drainage.

This project demonstrates the importance of considering the whole roof construction rather than only the visible membrane. The vapour-control layer, insulation design, tapered falls, substrate preparation and detailing all contribute to the long-term performance of the finished roof.

LocationAyrshire
Completed2022
BuildingSchool roof
ScopeFull strip-off and replacement
Vapour controlNew VCL
InsulationKingspan TR26
FallsTapered insulation
WaterproofingSingle-ply membrane
OutcomeImproved waterproofing, insulation and drainage
↑ Back to featured projects

Perth RC Campus — 7,000m² Roofing Project

Completed in 2016, Modern Roofing carried out approximately 7,000m² of roofing works across Perth RC Campus. Most roof areas were formed over standard metal decking and received the full insulated single-ply roof build-up.

Modern Roofing installed the full metal-deck package across the campus. Most areas used standard metal decking, while the approximately 1,400m² gym roof was formed over curved perforated metal decking. The plenum was a separate roof area and was the only section finished with standing-seam profiles. All roof areas then received the vapour-control layer, insulation and single-ply membrane build-up. The project demonstrates Modern Roofing's ability to deliver a complete education-sector roofing package from deck installation through to the finished waterproofing system.

Total projectApproximately 7,000m²
Plenum roofOnly area finished with standing-seam profiles
Deck installationAll metal decking installed by Modern Roofing
Gym roofApproximately 1,400m² over curved perforated metal decking
↑ Back to featured projects

Bathgate Nursery — Sika Fleeceback Membrane Overlay

Completed in 2010, the approximately 700m² project began when Modern Roofing was instructed to investigate recurring leaks at a live nursery in Bathgate. A roof appraisal and core sample were carried out before any refurbishment system was recommended.

The investigation showed that the insulation was damp only in isolated areas. Those sections were removed and replaced before a Sika fleeceback membrane was installed across the full roof area. This avoided an unnecessary full strip-out while providing the nursery with a new waterproofing layer.

Because children remained on site, access, deliveries, working areas and disruption had to be carefully controlled throughout the project.

LocationBathgate, West Lothian
Completed2010
Roof areaApproximately 700m²
AssessmentRoof appraisal and core sample
RepairsIsolated damp insulation replaced
SystemSika fleeceback membrane overlay
↑ Back to featured projects

Caldriven Manufacturing Works — Asbestos Cement Roof Coating

Completed in 2023, the project involved approximately 4,000m² of asbestos cement roofing at Caldriven Manufacturing Works. The existing roof remained in reasonable overall condition, so full replacement was not required. The aim was to preserve the roof and extend its useful service life.

The roof was cleaned and prepared using controlled working methods appropriate to the existing roof covering. Water run-off and debris were collected and managed rather than allowed to discharge freely from the roof.

Once preparation was complete, a liquid-applied coating system was installed to improve weather resistance and provide a practical refurbishment solution for the existing sheets.

ProjectCaldriven Manufacturing Works
Completed2023
Roof areaApproximately 4,000m²
SolutionControlled preparation and liquid coating
↑ Back to featured projects

O-I Glass Alloa — 1,700m² Metal Roof Replacement

Completed in 2025, Modern Roofing carried out a full strip-off and replacement of approximately 1,700m² of roofing at the O-I Glass site in Alloa.

The existing roof covering was removed before new Euroclad goosewing-grey box-profile roof sheets were installed across the full area. The works required careful sequencing to maintain progress across a large industrial roof while protecting the building below.

The complete roof area was safety-netted from below before the strip-off works began, providing collective fall protection throughout the removal and installation stages.

SiteO-I Glass, Alloa
Completed2025
Roof areaApproximately 1,700m²
SystemEuroclad goosewing-grey box-profile sheets
SafetyFull roof safety-netted from below
ScopeComplete strip-off and roof-sheet replacement
↑ Back to featured projects

Carlton Bingo Dumbarton — 800m² Asbestos-Cement Roof Replacement

Completed in 2016, Modern Roofing carried out the full strip-off and replacement of approximately 800m² of asbestos-cement roofing at Carlton Bingo in Dumbarton. The existing roof was replaced with a new Euroclad goosewing-grey metal sheet system.

Full scaffold access and edge protection were installed around the working area, while safety netting was fitted beneath the roof to provide collective fall protection during the strip-off and re-sheeting works. A scissor lift was used to lower the removed sheets safely from roof level into a dedicated enclosed asbestos-waste skip.

The asbestos-cement sheets were removed in planned sections using controls appropriate to fragile asbestos-cement roofing. Fixings were released carefully and unnecessary breakage was avoided. Operatives wore suitable asbestos PPE, including respiratory protective masks, disposable coveralls, gloves and safety glasses. The sheets were transferred onto the scissor lift, lowered rather than dropped, and placed directly into the enclosed skip for controlled transport and disposal through the appropriate special-waste route.

Once the existing sheets had been removed, the roof was prepared and re-sheeted using Euroclad goosewing-grey metal sheets, providing a durable new roof covering and a complete visual transformation of the building.

SiteCarlton Bingo, Dumbarton
Completed2016
Roof areaApproximately 800m²
Existing roofAsbestos-cement sheets
New systemEuroclad goosewing-grey metal sheets
SafetyScaffold, edge protection, safety netting and asbestos PPE
WasteScissor-lift lowering into a dedicated enclosed skip
ScopeComplete strip-off and roof replacement
↑ Back to featured projects

AG Barr — Large-Scale Roof Safety-Line Works

Completed in 2024, Modern Roofing delivered and coordinated an extensive programme of roof safety-line works across the AG Barr site. The project involved thousands of metres of safety-line coverage across multiple roof areas.

The works required careful planning of access routes, system layouts and installation sequencing so that the finished arrangement provided practical fall-protection coverage for future inspection and maintenance activities. Rooflight protection was also incorporated where required to help create safer access routes to rooftop plant and equipment.

Modern Roofing managed the overall delivery and coordination of the project, working with an experienced safety-line installation team to complete the works across the site.

SiteAG Barr
Completed2024
ScaleThousands of metres of safety-line coverage
ScopeSafety lines, access planning and rooflight protection
↑ Back to featured projects

Calderstone Industrial Products Ltd — 900m Sika Roof Walkway

Completed in 2026, Modern Roofing supplied and installed approximately 900 linear metres of reinforced roof walkway across the existing Sika membrane roof at Calderstone Industrial Products Ltd. The client wanted clearer, more durable access routes across the roof for routine inspection and maintenance.

The walkway build-up was designed to protect the existing membrane while creating a firm route underfoot. A fleece protection layer was installed first, followed by 3mm galvanised steel plate, a second fleece protection layer and a new Sika membrane covering. The membrane was securely restrained along both sides before the Sika walkway surface was installed above.

This layered construction helped spread foot traffic loads, protect the existing waterproofing from repeated access and provide a clearly defined route across the roof without unnecessarily disturbing the original Sika system.

As part of the same project, new roof vents were incorporated and sealed with carefully formed Sika membrane detailing to maintain the continuity of the waterproofing around each penetration.

SiteCalderstone Industrial Products Ltd
Completed2026
Walkway lengthApproximately 900 linear metres
Existing roofSika membrane system
Protection layersFleece above and below steel plate
Reinforcement3mm galvanised steel plate
SurfaceSika membrane and walkway finish
Additional workNew vents sealed in Sika membrane
↑ Back to featured projects
Blurred Modern Roofing gutter appraisal report for the Bacardi cask warehouse

John Dewar & Sons / Bacardi — Cask Warehouse Gutter Appraisal

In October 2024, Modern Roofing carried out a detailed gutter and drainage appraisal at Cask Warehouse 1 for John Dewar & Sons Ltd - Bacardi in Glasgow. The roof was divided across six corrugated-metal slopes, with six internal composite gutters separated by fire-break walls and two external gutters.

Each internal gutter run was approximately 57 linear metres, giving around 342 linear metres in total. The drainage was siphonic, so the condition and correct operation of the outlets, baffle plates and airtight connections were important to the performance of the system.

The inspection identified widespread failure at PVC membrane jointing strips, water trapped beneath the membrane, corrosion and blistering, unsuccessful previous outlet repairs, missing or displaced baffle plates, blocked outlets, corroded stop ends and missing or inadequate overflows. These defects were preventing parts of the siphonic system from operating as intended.

The report recommended outlet and pipe cleaning, reinstatement of the siphonic components, local steel repairs, treatment of corrosion, Sika SA tape to joints and outlets, a no-flame Sika gutter-lining system, new removable baffle fixings and 100mm overflows at the stop ends. A planned gutter-cleaning schedule was also provided.

ClientJohn Dewar & Sons Ltd - Bacardi
CompletedOctober 2024
BuildingCask warehouse, Glasgow
Scale6 internal gutters at approx. 57 lm each
DrainageSiphonic drainage system
OutputCondition report and prioritised upgrade recommendations

This appraisal addressed the visible gutter waterproofing and drainage condition. It was not a structural survey.

↑ Back to featured projects

East Kilbride Police Station — Liquid Roofing & Sika Single-Ply Works

Completed in 2024, this roof refurbishment at East Kilbride Police Station involved two linked workstreams: approximately 3,000m² of liquid-applied roofing renewal and around 700m² of new Sika single-ply membrane. The project shows Modern Roofing’s ability to deliver practical solutions across mixed roof areas where different waterproofing approaches are required on the same site.

The liquid-applied sections were used to refurbish existing areas with a seamless waterproofing finish, while the membrane areas received a new Sika single-ply system to provide a durable and neatly detailed modern roof covering. Together, the works formed a coordinated package designed to improve long-term waterproofing performance and help extend the service life of the building.

LocationEast Kilbride
Completed2024
Liquid roofingApprox. 3,000m²
Single-ply membraneApprox. 700m²
SystemLiquid-applied roofing and Sika single-ply membrane
Project typeRefurbishment and waterproofing renewal

Glasgow Science Centre — Children's Water Play Area Waterproofing

Completed in 2023, Modern Roofing installed approximately 50m² of non-VOC liquid waterproofing to the children's water-play area at Glasgow Science Centre. The work was completed on nightshift so the popular exhibit could remain available to visitors during normal opening hours.

A non-VOC system was selected because the work was carried out in an enclosed visitor environment used by young children. The low-odour formulation helped avoid off-gassing concerns, supported good indoor air quality and allowed the area to return to service quickly after curing.

The existing surfaces were carefully prepared before the seamless liquid membrane was applied to the required thickness and full coverage. The finished system was designed to cope with constant moisture, repeated cleaning and regular movement within the play area.

The completed waterproofing provided a clean, hygienic and low-maintenance finish, helping protect the exhibit infrastructure while supporting Glasgow Science Centre's focus on visitor wellbeing and more sustainable building choices.

SiteGlasgow Science Centre
Completed2023
AreaApproximately 50m²
LocationChildren's water-play exhibit
Working hoursNightshift installation
SystemLow-odour non-VOC liquid membrane
BenefitsSeamless, hygienic and suitable for constant moisture
OutcomeRapid return to use with minimal disruption
↑ Back to featured projects
Completed non-VOC liquid waterproofing at Glasgow Science Centre's children's water play area
Blurred sample of a detailed Modern Roofing public-sector roof appraisal report

Forfar — Detailed Public-Sector Roof Appraisal

Completed in 2023, the appraisal combined hands-on inspection, photographic evidence and practical roofing judgement to record the visible roof condition, defects, drainage concerns and safety-line observations.

The report format was designed to help the client understand priorities and plan sensible remedial works rather than commit money before the roof condition had been properly recorded.

LocationForfar
Completed2023
ServiceDetailed roof appraisal
EvidencePhotographs and observations
OutputPrioritised recommendations
↑ Back to featured projects

Looking for a Project Similar to Yours?

Tell us about the building, roof type, leaks or planned refurbishment. We can explain which project examples are most relevant and whether a survey, repair, refurbishment or replacement route should be considered.

Euroclad CSCS Constructionline Gold Member CITB Roof Integrity Testing Euroclad CSCS Constructionline Gold Member CITB Roof Integrity Testing