Home / Industrial Roofing North Lanarkshire Case Studies
Modern Roofing (Scotland) Ltd

Industrial Roofing North Lanarkshire Case Studies

Cumbernauld 2000m2 Sika membrane refurbishment and Airdrie factory cut edge corrosion treatment.

Modern Roofing is based in North Lanarkshire and carries out industrial and commercial roofing across Cumbernauld, Airdrie, Coatbridge, Bellshill, Motherwell, Wishaw, Eurocentral and the wider Central Belt.

North Lanarkshire project proof:

  • 2000m2 Cumbernauld flat roof refurbishment
  • Core samples, appraisals and main contractor solution
  • Sika membrane overlays, strip-off areas and recovery board areas
  • Airdrie factory cut edge corrosion treatment
Cumbernauld Project2000m2 Sika membrane roof refurbishment
Airdrie FactoryMetal roof cut edge corrosion treatment
Main Contractor RoleSurvey, solution, safety and delivery
North LanarkshireLocal base with Scotland-wide capability

Industrial & Commercial Roofing Across North Lanarkshire

Modern Roofing carries out industrial roofing, commercial roofing, roof appraisals, roof repairs, roof refurbishment, single-ply membrane roofing and metal roof treatment across North Lanarkshire.

This page shows two real North Lanarkshire project examples: a large Cumbernauld flat roof estate where Modern Roofing was asked to act as main contractor and provide a solution for every flat roof area on site, and an Airdrie factory roof where cut edge corrosion was treated using preparation, primer and liquid plastic coating.

For wider service information, see our Industrial Roofing Scotland, Cumbernauld & Airdrie Roofing, Industrial Roof Surveys Scotland and Sika Roofing pages.

Core sample during Cumbernauld industrial roof appraisal by Modern Roofing

Core sample taken as part of the Cumbernauld flat roof appraisal.

Completed Sika membrane industrial roof refurbishment Cumbernauld

Completed Cumbernauld Sika membrane roof refurbishment works.

Direct answer

Modern Roofing provides industrial roofing in North Lanarkshire, including Cumbernauld and Airdrie industrial roof refurbishment, roof appraisals, core sampling, Sika membrane systems, roof recovery board installation, strip-off and replacement areas, handrail installation and metal roof cut edge corrosion treatment.

Cumbernauld Case Study – 2000m2 Sika Membrane Flat Roof Refurbishment

Modern Roofing was asked to come in and act as main contractor to provide a practical solution for every flat roof area on a large Cumbernauld site. Some roofs were ageing, some were leaking, and different areas needed different refurbishment methods.

Location

Cumbernauld, North Lanarkshire

Role

Main contractor roofing solution

Size

Approximately 2000m2

System

Sika membrane throughout

Roof appraisals and core samples

Modern Roofing carried out roof appraisals and took core samples to understand the condition of the existing roof areas. This allowed each section of the site to be assessed properly before deciding whether it needed a full strip-off, an overlay onto existing felt, or a roof recovery board installed over the existing Protan system.

Different roof areas, different solutions

Some flat roof areas required a total strip-off followed by a new vapour control layer, insulation and Sika membrane. Other existing felt areas were suitable for a direct overlay onto the felt.

The largest areas of old Protan membrane required a roof recovery board to be fitted first, before the Sika membrane system was installed.

Handrail and safe working system

Modern Roofing also installed the handrail system. The handrail used feet that could be slid up, allowing recovery board and membrane to be fitted below before the handrail was lowered back down and moved along to the next working area.

Handrail system during Cumbernauld Sika membrane roof works

Handrail system coordinated with the recovery board and membrane works.

Roof areaCondition / issueModern Roofing solution
Failed or unsuitable areasExisting roof build-up needed removed and rebuilt.Total strip-off, new VCL, insulation and Sika membrane system.
Existing felt areasSuitable for refurbishment without full strip-off.Direct overlay onto existing felt with Sika membrane.
Largest old Protan areasExisting Protan needed a suitable overlay surface.Roof recovery board fitted before Sika membrane installation.
Roof edge / access areasSafe working and edge protection required.Handrail system installed and moved in coordination with the roof works.

Why this job matters for Cumbernauld clients

This project shows Modern Roofing acting as the main roofing contractor on a large 2000m2 industrial roof estate, assessing each area properly and applying the correct Sika membrane solution rather than treating every roof area the same.

Cumbernauld Sika Membrane Project Photos

The images below show the survey, access, loading, handrail, progress and completed roof areas from the Cumbernauld project.

Airdrie Case Study – Factory Cut Edge Corrosion Treatment

Modern Roofing also completed cut edge corrosion treatment works to a factory roof in Airdrie. The existing metal roof sheets had corrosion to the cut edges, which required preparation and coating to help protect the roof sheets from further deterioration.

Location

Airdrie, North Lanarkshire

Building

Factory roof

Issue

Cut edge corrosion on metal sheets

Solution

Primer and 2 coats liquid plastic treatment

Rooflights netted and handrail installed

Before the cut edge corrosion treatment was carried out, Modern Roofing netted the rooflights and installed handrail to help control access and safe working across the factory roof.

Grinding back to sound steel

The affected cut edges were ground back to sound steel. This preparation stage is important because coating over poor or loose corrosion would not provide a proper long-term treatment.

Primer and two-coat liquid plastic treatment

Modern Roofing installed primer followed by two coats of liquid plastic cut edge corrosion treatment. The purpose was to protect the exposed cut edges, reduce further corrosion risk and extend the service life of the existing metal roof sheets.

Airdrie factory roof cut edge corrosion grinding back to sound steel

Grinding back affected cut edges before primer and coating.

Why this job matters for Airdrie clients

This project shows how cut edge corrosion can be addressed before metal roof sheets deteriorate further. By netting rooflights, installing handrail, preparing the sheet edges properly and applying primer plus two coats of liquid plastic treatment, Modern Roofing provided a practical refurbishment solution for the Airdrie factory roof.

Airdrie Factory Cut Edge Corrosion Photos

The images below show the Airdrie factory roof before treatment, preparation stages and completed liquid plastic cut edge corrosion works.

Industrial Roofing Coverage Across North Lanarkshire

These case studies are based on Cumbernauld and Airdrie projects, but Modern Roofing supports industrial and commercial roofing clients across North Lanarkshire and the wider Central Belt.

Main North Lanarkshire areas covered

  • Airdrie
  • Cumbernauld
  • Coatbridge
  • Bellshill
  • Motherwell
  • Wishaw
  • Caldercruix
  • Chapelhall
  • Plains
  • Eurocentral
  • Newhouse
  • Wardpark

Typical North Lanarkshire roofing clients

We support factories, warehouses, food and drink production sites, industrial estates, public-sector buildings, commercial landlords, main contractors and facilities managers.

  • Industrial flat roof refurbishment
  • Sika membrane roofing systems
  • Metal roof cut edge corrosion treatment
  • Roof appraisals and core samples
  • Handrail and safe access coordination
  • Repair, overlay, recovery board or replacement advice

Roofing services shown in these case studies

The Cumbernauld and Airdrie projects demonstrate different parts of the wider industrial roofing service Modern Roofing provides across Scotland.

Industrial Roofing North Lanarkshire

Roofing works for factories, warehouses, industrial units, public sector buildings and large commercial roof areas.

Roof Appraisals & Core Sampling

Survey-led recommendations using inspections, core samples and practical assessment before selecting the roof system.

Sika Membrane Refurbishment

Sika membrane systems installed over suitable felt areas, recovery board areas and full strip-off rebuild areas.

Roof Recovery Board Overlays

Recovery board installed where required to create a suitable surface before the new membrane system.

Cut Edge Corrosion Treatment

Metal sheet preparation, grinding, primer and liquid plastic treatment to help protect cut edges.

Handrail & Safe Access

Handrail and access planning coordinated with the roofing works where required.

Real North Lanarkshire roofing project experience

These projects show Modern Roofing delivering both large-scale industrial flat roof refurbishment and targeted factory metal roof treatment in North Lanarkshire.

Large roof estate

The Cumbernauld project involved around 2000m2 of roof areas, each assessed and treated according to condition.

Technical roof build-ups

Strip-off areas, new VCL, insulation, recovery board, overlays and Sika membrane works were all coordinated on the same site.

Local factory repairs

The Airdrie project shows practical treatment of metal roof sheet cut edge corrosion.

Industrial Roofing North Lanarkshire FAQs

Do Modern Roofing cover industrial roofing in Cumbernauld and Airdrie?

Yes. Modern Roofing is based in North Lanarkshire and carries out industrial and commercial roofing works across Cumbernauld, Airdrie, Coatbridge, Bellshill, Motherwell, Wishaw and surrounding areas.

What work was carried out on the Cumbernauld project?

Modern Roofing acted as main contractor, carried out roof appraisals and core samples, then delivered different Sika membrane solutions across approximately 2000m2, including strip-off areas, direct overlays and recovery board areas.

Why were different roofing solutions used on the same Cumbernauld site?

Different roof areas had different conditions. Some needed full strip-off with new VCL, insulation and membrane. Some felt areas were suitable for direct overlay, and the largest old Protan areas required recovery board before the Sika membrane was installed.

What is cut edge corrosion treatment?

Cut edge corrosion treatment is used on metal roof sheets where exposed sheet edges have started to corrode. The affected areas are prepared, primed and coated to help protect the roof sheets and extend service life.

Can Modern Roofing advise whether a roof needs repair, overlay or replacement?

Yes. Modern Roofing can inspect the roof, take core samples where required and advise whether repair, recovery board, overlay, refurbishment or full replacement is the most practical option.

Need an industrial or commercial roof assessed in North Lanarkshire?

For industrial roofing, roof appraisals, Sika membrane refurbishment, cut edge corrosion treatment or roof repairs in Cumbernauld, Airdrie or the wider North Lanarkshire area, contact Modern Roofing.